Donor Funded Projects

The Sierra Leone Roads Authority accomplished a number of projects/works during the period 2012 to-date. The donor funded projects/works accomplished include the following:

A. On-going Projects
Currently, the Sierra Leone Roads Authority is monitoring the implementation of Donor Funded Projects and new Studies. Some of the Donor Funded Projects include:
• Rehabilitation of Tokeh –Lumley (Phase III) highway Project – 28km
• Rehabilitation of Matotoka – Sefadu road Project – 120km
• Rehabilitation of Moyamba – Moyamba Junction road Project including the construction of Magbele, Mabang, Gbangbama and Moyamba Town bridges -36km
• ehabilitation of Bandajuma – Mano River bridge Road Project including the construction of Sewa bridge, Bandajuma bridge and Moa (Bandasuma) bridge – 105km
• Rehabilitation of Hillside Bye-Pass road Project (Phase 11) – 2.2km
Total = 291.2km

B. Completed Projects
The Sierra Leone Roads Authority has successfully supervised the completion of the following Donor Funded Projects:
• Rehabilitation of Hillside Bye-Pass road Project (Phase I) – 1.5km
• Rehabilitation of Lungi – Port Loko road Project – 62km
• Rehabilitation of Feeder Roads in Kono and Bonthe Districts under the Infrastructure Development Project – 306.5km
• Rehabilitation of Feeder roads in Kenema (176km), Kono (100km), Kailahun (120km) and Koinadugu (104km) Districts under the Rehabilitation and Community Based Poverty Reduction Project-500km. Under this project, 30m bridge was rehabilitated at Mannah II along the Kabala – Krubola road in the Koinadugu District.
• Widening of seven bridges along Masiaka – Bo highway
• Rehabilitation of Lumley beach road and Rue de la Paix road Project – 11km
• Mitigation works at Tengbeh town and Moyiba town
• Rehabilitation of Regent – Kossoh Town road Project – 11.26km
• Rehabilitation of Freetown- Conakry highway Project – 76km
• Rehabilitation of Masiaka- Bo highway Project – 148km
• Rehabilitation of Bo-Kenema (65km) and Makeni- Matotoka (35km) Highway Project – 100km
• Rehabilitation of Kenema – Pendembu Road Project – 86 km
• Rehabilitation of Makeni – Kabala road Project( Phase 1) – 120km
• Reconstruction of the Regent – Grafton Highway – 11.26km
Plus five (5) bridges Project Total = 2,030.52km

C. Proposed Projects/Studies
The Government of Sierra Leone through the Sierra Leone Roads Authority has also negotiated a number of Studies/Projects with Donors and the implementation time tables
are being finalized. Some of these Studies/Projects include the following:
• Rehabilitation of Pendembu – Kailahun road Project – 28km
• Reconstruction of Kailahun – Koindu – Guinea Border/Liberia border Road -75.34km
• Construction of Kabala – Krubola – Guinea border Road – 96km
• Construction of Sefadu – Komba Yendeh – Guinea border Road – 78km
• Reconstruction of Kenema – Joru – Zimmi Road – 92km
• Construction of flyovers within Freetown at strategic points
• Feasibility study of a coastal road from Cline Town – Murray Town – 13.9km
• Rehabilitation of Bo – Bandajuma Road Project – 46km
Total = 429.24km

Latest news from our blog

REQUEST FOR EXPRESSIONS OF INTEREST FOR SMALLHOLDER COMMERCIALIZATION AND AGRIBUSINESS DEVELOPMENT PROJECT

Government of Sierra Leone REQUEST FOR EXPRESSIONS OF INTEREST COUNTRY: Sierra Leone West Africa  NAME OF PROJECT: Smallholder Commercialization and Agribusiness Development Project PROJECT No: P153437 LOAN NO./CREDIT NO./ GRANT[…]

Read more

TERMS OF REFERENCE FOR THE REVIEW OF THE NATIONAL RURAL FEEDER ROADS POLICY IN SIERRA LEONE

              MINISTRY OF AGRICULTURE AND FORESTRY (MAF) SMALLHOLDER COMMERCIALIZATION AND AGRIBUSINESS DEVELOPMENT PROJECT TERMS OF REFERENCE FOR THE REVIEW OF THE NATIONAL RURAL FEEDER ROADS POLICY IN SIERRA LEONE: SL-MAFS-236679-CS-CQS[…]